The process

Interconnection and Permitting

The step that most often delays a project.

Interconnection is the step that most often delays a solar or storage project. The utility sets the rules; your installer files the paperwork.

1

Pre-application check

Ask the utility whether the feeder or network has capacity for your system size, and what study the utility will require.

2

Application and study

File the application with a single-line diagram and equipment data. Larger systems and storage may need engineering studies and cost-sharing.

3

Permits and inspections

Building, electrical and fire-code approvals. Storage inside buildings draws extra fire-code review. Confirm requirements with your installer and the City.

4

Permission to operate

After construction and inspection, the utility gives permission to operate. That date often drives the placed-in-service date for tax purposes, so plan buffers.

For solar and wind, the December 31, 2027 in-service deadline can turn an interconnection delay into a lost federal credit. Start the application at the beginning, not after the contract is signed.