Interconnection and Permitting
The step that most often delays a project.
Interconnection is the step that most often delays a solar or storage project. The utility sets the rules; your installer files the paperwork.
Pre-application check
Ask the utility whether the feeder or network has capacity for your system size, and what study the utility will require.
Application and study
File the application with a single-line diagram and equipment data. Larger systems and storage may need engineering studies and cost-sharing.
Permits and inspections
Building, electrical and fire-code approvals. Storage inside buildings draws extra fire-code review. Confirm requirements with your installer and the City.
Permission to operate
After construction and inspection, the utility gives permission to operate. That date often drives the placed-in-service date for tax purposes, so plan buffers.